How long should it take to install 1,000 square feet of laminate flooring? (all on one level; two man crew) | Half day (about 4 hours) | 9% | Full day (about 8 hours) | 27% | Two days | 45% | Three days | 18% | | | Question: How long should it take to install 1,000 square feet of laminate flooring? (all on one level; two man crew) Top Answer (45% of 11 votes): Two days.
Answer: Three days Explanation: For a two-man crew installing 1,000 square feet of laminate flooring on one level, the job typically takes about two to three days. This timeframe can vary based on factors such as the experience level of the installers, the complexity of the layout, and any necessary preparation work like moving furniture or removing old flooring. Efficient workflow and minimal complications can expedite the process. | DS Contracting | Answer: Two days Explanation: Again, depending on doors and angles. | SERVICE MAX INTERNATIONAL, INC | Answer: Full day (about 8 hours) Explanation: If empty and ready to go. | Floors 2 UR Doors |
|